Skip to Content

Archived discussions are read-only. Learn more about SAP Q&A

Slotting and rearrangement

Hi Team,

I have problem with slotting and rearrangement.

Product :1910

Putaway control Indicator (PACI) is :0020 ( it will determine the storage type 0020)

Storage Section : FAST (Fast moving Material)

Bin Type: B001

I have a slotting condition on Product group and WH to get new putaway control indicator.

example: TRWH(WH) and 0001(Product group) will determine 0030 (PACI) .0030 will determine storage type 0030.

I have run the slotting for the above product and system proposed new PACI 0030 .it means , I need to keep the product in storage type 0030 as per new PACI

If I run the rearrangement for the product , system is not proposing the any warehouse Task/optimal Bin to move the product to ST 0030 with Storage section(FAST) and Bin Type(B001) combination ,eventhough the Bins are available . why ?

Is there any config missed to get new bins in 0030 ??..Please help me in this

But if I change the Bin type (B002) and storage section(SLOW) in product , it is proposing a new optimal Bin with new Storage section and bin type. Why ?

Thanks

Jonnakuti Raju

Tags:
Former Member
Not what you were looking for? View more on this topic or Ask a question