on 06-13-2011 12:12 PM
Hi,
I need to have the measurement created automatically for a PRT, which is used in the task list of routing, in production.
I have gone through the previous threads and checked the 'usage value formula' also. System is not creating measurement document when I confirm the production order. I am able to see the PRT usage value.
I am using ECC 6.0.
James Prabaharan
This message was moderated.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Maheswaran,
Can you elaborate what you mean by default measuring point? I have created the equipment with type 'P' with PRT tab and created a measuring counter for this PRT . This is assigned in the PRT screen. I have followed every step mentioned in the thread you have referred, yet the document is not created.
The production order is confirmed and the material movement has also taken place.
Edited by: James Prabaharan on Jun 13, 2011 2:02 PM
Dear Friends,
Is there any other answers please?
Edited by: James Prabaharan on Jun 15, 2011 1:25 PM