QM Inspection in production

Former Member
0 Kudos

My client has this scenario

For raw materials

10% of the samples is inspected during procurement at goods receipt.

then 100% inspection of the same is done during production.Some times rejections happen at the shop floor.

First scenario is easy .Please advice me on how to conceive the second scenario.

Accepted Solutions (1)

Accepted Solutions (1)

former_member1362664
Contributor
0 Kudos

Hi..

To achieve this requirement there are some developments are required.

e.g.:- One different movement type should be there for handling vendor rejection from production line to transit store.

One different transit store should be there for handling the rejections.

Now you can do the transfer posting thru MIGO from production line to transit store. and can select supplier from partner tab.

Different movement type and storage location would be very helpful for reporting part. And maintain discipline.

Regards

Vivek.

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

Use long term inspection in MIC I thing you're problem will get solve..

Regards,

Ravi

Former Member
0 Kudos

Hi,

Checking of RAW materials during production means you have to consider inspection type 02 i.e Goods Issue inspection but this is not a stock relevant.

Or Activate stock transfer inspection 08 within the plant i.e Raw material storage location to Production storage location this is stock relevant.

Regards,

Sadashiv Rane