Sales Order Confirmation Qty

Former Member
0 Kudos

Please consider the following situation: today 6/10: I have a sales order with an order qty 1; this is a bought in item linked to a purchase order, the PO was goods receipted yesterday and my 1 piece shows in stock (as sales order stock assigned to this sales order). The confirmed quantity shows 1 piece on 6/13. I can not figure out why this is showing as 6/13 and not today. I checked VOV8 for my order type lead time, i checked OVLZ for my shipping point lead-time....they all show 0. I have the part in stock, so why do I see a confirmation date 3 days in the future? Thank you.

Accepted Solutions (0)

Answers (2)

Answers (2)

Lakshmipathi
Active Contributor

Check in material master what is maintained for the field GR Processing Time in MRP view.

thanks

G. Lakshmipathi

Former Member
0 Kudos

Why would the GR time matter if the parts are already in stock?

Shiva_Ram
Active Contributor
0 Kudos

Did you check the route assigned to the line item? The route may be 3 days route assigned to it.

Regards,

Former Member
0 Kudos

Route...VL53, yes? I do not see any routes in our system.

sbuttler77
Active Participant
0 Kudos

Go to the schedule line in your order and click Shipping at the botton (with the confirmed line selected) that will give you an overview of the shipping process.