on 06-09-2011 7:44 PM
Hello Gurus,
I need some help...
we have a project with 4 billable resources assigned. I need to make the person responsible for each wbs with different person responsible like X for 3 elements and Y for one element..When i save and check again in CJ20N, the all 4 elements are showing with the X . I am unable to find the personal respons Y.
(When I change it a lever 2 or 3 it defaults back to the original). I need to have flexibility on this.
Please advise how to do.
Giri
better to check in project profile is there any substitution is active or not.. You may find one in OPSN but not necessary to activate it. Please check in OPSA ...
Substitution is not required then remove it from the project profile (in OPSA)
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
hi giri,
Check the tranction OPSN ....If is there any substitution rule maintain or not.....If it is not maintain .please maintain it....hope it wont come....
By
prathap
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
As Virendra has pointed out, it is very much possible in standard SAP. In transaction OPSN check if there is any substitution in place that is causing this to happen.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
In Std SAP it is possible
Obviously in your case there is some substitution rule in place which is replacing the manual entries on exit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.