cancel
Showing results for 
Search instead for 
Did you mean: 

CO43 (ABAP RKAZCO43) run in prior period but post in current period

Former Member
0 Kudos

I have been trying to find a way to make current month postings for Transaction CO43 (ABAP RKAZCO43) for prior month work done on a production order. I do not want to open up OKP1 (Actual overhead (periodic)) for the prior period and post to the prior period. Is there a transaction to allow this procedure.

Accepted Solutions (1)

Accepted Solutions (1)

ajaycwa1981
Active Contributor
0 Kudos

Hi

The only way I see is to inflate the Overhead of the current period and then calculate overhead

br, Ajay M

Answers (0)