Plan Price updation in material master

former_member218048
Active Participant
0 Kudos

I am trying to update the plan price-1, plan price-2 & plan price-3 in the Costing tab of the Material master. When I try to save the data, error is coming like this:

Message no. MG142

Diagnosis

When you transfer data by direct input or when you distribute data by application link enabling (ALE), the system performs the same checks as in online mode. However, the value 100 is not allowed for the field Purchasing Group.

Procedure

Check what values are allowed for the field in online mode.

I am not able to underastand what to do ? Please advise me.

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Why your Tring to enter the Plan Price in tht Fields under the Costing tab2 in Material Master.Please clarify.

former_member218048
Active Participant
0 Kudos

These prices are required for costing run.

However, my issue has been resolved. The purchasing group field was wrongly given values which were not available in the system by the MM people. I corrected it with a right one and now it is working fine.

Thanks to all of you

Answers (2)

Answers (2)

former_member218048
Active Participant
0 Kudos

Thanks

atif_farooq
Active Contributor
0 Kudos

Dear:

You may need to verify your material type and settings. Has a default entry been specified, is the field set as mandatory or optional, etc. etc... e.g the HAWA material type the product allocation field is commonly displayed and is on the Basic Data 1 screen - field MARA-KOSCH