cancel
Showing results for 
Search instead for 
Did you mean: 

Product Cost COntroller..

Former Member
0 Kudos

Hi,

I am using the Tcode CO01 and i get an error "NO PRODUCT COST CONTROLLER COULD BE DETERMINED FOR MATERIAL XYZ"..suggest how do i go about this error.

Regards

Gnawang

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

in Production Order Under Control data Tab, check if you have assigned Values under Costing Like

1.CstgVariantPlan

2.CstgVariantAct

3.Costing Sheet

4.RA Key

5.PlannedCostCalc

I hope because of the missing values in the above Fields you are getting the Error.

Please check

Thanks

Goutam