on 06-04-2011 8:06 PM
Dear all,
In Repetetive manufacturing.After running the MRP , system is creating the planned order for fert and the raw materials.
How to see the reservation created against these planned order so that stores person can issue the material to the production against the reservation?
I tried with MF60 Pull List but I am not able to get the list , I also tried with MB25 there also I am not able to get the list. screen is blank without any material.
In MF60 IN GLOBAL SETTING I have not ticked INCLUDE ALL REQUIREMENTS and ROUND UP REPLISHMENT PROPOSALS remaining all are ticked.
when I give the planned order No and execute message comes NO ORDERS WERE FOUND.
When I give the material no and dont give planned order than the screen opens but it is blank no data is selected
Please help me out if any config settings has to be done.
Thanks & regards,
Mona
Mona,
Is the planned order type "PE"?
Best Regards,
DB49
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Mona,
in MF60, enter the planned order. Deselect "Only relevant f. Productn". Make sure the 'Selection period' date is far enough into the future to include the requirements you wish to issue.
On the subsequent list, select one of the items, then 'Additional Details.' Production information tab.
I can't think of an instance, though, when I would want to issue to an LA order. Normally, you create and execute a PE order in Repetitive.
Best Regards,
DB49
Dear Mona,
1.Check whether check box for Repetitive Manufacturing is included in MRP4 view and suitable REM profile has been assigned.
2.Check whether the production version is relevant to REM is included in the production version of that material in C223 or else
in MM03.
3.BOM selection method should be 2 in MRP4 view of the material master.
4.Check whether the suitable scheduling parameters has been maintained in OPU5 for the order type PE for the plant.
5.When you create a planned order manually(using stock order type LA) in MD11,once after the system picksup the relevant
production version and REM allowed indicator set in the production version the order type gets changed to PE.
6.Check all the component storage location extension using MMSC.
7.Also if sufficient stock for the components of the planned order exists means,you will not be able to see any
requirements/missing parts in MF60.
Regards
S Mangalraj
Monalisa,
You can check mark, the filed genearte stock transfer reservation in global settings of MF60 and the execute MF60 with selection criterion such as pegged req( assy material number).
Make sure relevent unrestricted stock exists for the component in storage locations.
Once replisnishment propsosals are created for material staging, go to MF65 and issue the material from warehouse agaist stock transfer reservations.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
In MD16 screen you can see the reservation numbers for each planned orders.
Regards,
V. Suresh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Mona,
Check these parameters,
1.Check whether the order type is PE for the mentioned planned orders.
2.I assume that the MRP run was taken for the active requirements.
3.The system does not create any automatic reservation for the REM related planned orders.
4.Only by creating stock transfer reservation for 311 movement from the main/central stores to the production storage location
using T code- MF60 will resolve the issue.Based on the reservation created the stores person can transfer the components
either using MF65 or else MB1B.
Check and revert with your further queries.
Regards
Mangalraj.S