Hi,

We are using support pack SAPKH60408 and checked LOG_MM_MAA_1 business

function is not activated.

But at MIRO with reference to PO if planned delivery cost option taken

for transporter invoice posting, the values proposed by the system are

incorrect.

For example,

If PO no. is ****

Qty ordered 24,000

GR done twice of 12000 each

Now from shipment cost doc calculation suppose two delivery costs are

created; 1) 5000 for first GR and 2)6000 for 2nd GR.

Now while doing MIRO for delivery cost corresponding to first GR

(Before 2nd GR got posted),referencing PO no.the value proposed 5000

which is correct.

Now after posting the first MIRO if user is doing second MIRO(After 2nd

GR got posted) for delivery cost with ref to same PO no. then the value

propsed is 5500 but it should be 6000, since the balance in freight

clearing account is 6000 only.

System is averaging out the values, is it standard functionality or any

bug.

Already gone through the note no.1533109 do we need to implement the

said note.

Accepted Solutions (1)

Accepted Solutions (1)

former_member187989
Active Contributor
0 Kudos

Apply note in test environment,simulate issue & check it is solved.

Former Member
0 Kudos

Thanks Jeyakanthan, but I had one doubt as per the said note the prerequisite is business function LOG_MM_MAA_1 activaed.

But in our case it is not, still the note holds goods us.

Regards

pankaj_singh9
Active Contributor
0 Kudos

Hi,

This may cause problem for single account assigned POs also once you activate implement EHP4 functionalities.

Better activate Business Function "LOG_MM_MAA_1" and then implement the note 1533109.

This will not hamper any of the exisiting process whether it is single or multiple account assigned PO.

Former Member
0 Kudos

Hello,

Is there any possibility of doing bill wise MIRO for both goods and planned delivery cost in a single screen apart from refering PO and option goods+planned delivery cost?

The scenario is; vendor is common for both goods and delivery cost,organization want to pass MIRO bill wise for goods and delivery cost at same instance.

Regards

former_member187989
Active Contributor
0 Kudos

Please raise it as a separate question.