GR done at MAP and not at price in PO


I have created PO with basic price as Rs.100

Now MAP is Rs.99.50 in material master.. Price control is V in the material master

When i did GR, GR accounting entry was posted at MAP price and not at the price mentioned in PO.

I want that GR should be done at price in PO and not at MAP.

Is there any setting which needs to be done by MM person so that GR is done at PO price and not MAP.