on 06-02-2011 9:22 AM
Dear Experts,
I am configuring the SUpport desk and charm process for the GRC system.
We have already implemented support desk process for r3, crm, bw, srm, etc...
Now i have done the necessary changes in the BCOS_CUST in sm30. and the roles
SAP_SUPPDESK_CREATE
SAP_SV_FDB_NOTIF_BC_ADMIN also i have given to the user in the sattilite system.
But still i am getting this error.
Error in Local Message System: RFC destination
SM_SP1CLNT200_BACK does not exist. Message was Not
Created
Thanks in advance
pnts wl b rwrd.
Regards,
Umesh
Hi
I gues u r with the latest version 10.0 ? Have you properly defined the GRC system in smsy? created all the needed RFC?including back rfc?, if not
follow the note [Note 1536525 - GRC Access / Process Control - Upgrade add-on handling|https://websmp230.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=1536525] under the section,
Configuration of the product system in the Solution Manager system (transaction SMSY)
Thanks,
Jansi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Prakhar,
Thanks for quick reply.
I have generated the ibase for GRC in BP_GEN and then for the 000 and the (300 my dev client ) goto---> partner and then assigned the Administratod and sold to party BP .
But still it is not able to capture the IBASE in GRC ticket, and also the solman ticket.
What could be the problem....??? Please suggest.
Regards,
Umesh
Hi.
its starnge, since sold to party determined by ibase. any way please check this,
goto spro > solution managar>scenario specfic set > service desk > partner determination procedure > define partner determination procedure>select your procedure slfn(if u have customized profile select that ) > partner function in procedure > there should be a link "sold to party".. go to details > check Access Sequence column 0018 SAP Service: Determination via iBase/Ind.
thanks,
Jansi
Dear Jansi,
The settings is already maintained.But still the Ibase and sold to party and reported by is not captured.
If i create the ticket from solman using the Notif_create tcode i will maually give the i base and sysid and client right. I f i create in this way the SOLD to party is captured.
Please send any doc if u have to configure Service Desk for the solman.
mial ID is jsumesh85 at g mail
Regards,
Umesh
First check(etc. via CRMD_ORDER) if Your ABA notification / support message have filled in proper installation number etc.
I had problem with strange entries BCOS_CUST in sattelite systems which gave wrong installation number in message and therefore system couldn't find proper system in iBase (SAP note 449330 resolved problem)
Dear Jhansi,
I resolved the error . It was the same error which you were facing.
ur post helped me to resolve the error.
I have doubt in the CHARM for DUAL stack (GRC system ABAP + Java ) please lete me know how to configure the things for the charm process.
1. I need to create single project or i need to create two projects for two systems.
2. How will be the maintainence cycle one maintainance cycle or two maintainance cycle.
Thnks
Regards,
Umesh
Hi Umesh,
Can you please let me know your GRC system is ABAP+Java or Only java stack.
Can you also check in SMSY whether the assignments for the instances and system information is properly set?
THanks,
Jagadish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
10 | |
10 | |
8 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.