Hi All,

I have created a production order with 20 meter Square, when the cost is calculated in Production Order Balance Display system is showing below values

The BOM requirement is 0.464 Meter Cube, I have a query regarding confirmation

Origin Total plan Cost Plan qty

I100210224/MACH 166.7 1.667

I100210224/LABOR 83.35 1.667

I want to know how system is calculating Plant Qty & Total Plan Cost for Two Activity Type.

Regards,

Vivek

Accepted Solutions (0)

Answers (2)

Answers (2)

vivek_srivastava12
Active Contributor
0 Kudos

Answered

Former Member
0 Kudos

Hi,

If u go to ur production order control tab, u'll find a costing variant plan (eg PPP1). System is calculating the plan cost using that costing variant. Activity prices are coming from KP26 only.

Best Regards