planned order created against cir

Former Member
0 Kudos

I have created planned order against cir which cannot be converted to production order. The system says REQUIREMENT TYPE KD Iis not supported for conversion. In T code OVZG system accepts only numerical 2 as assembly type. Since then after MRP run instead of getting planned order system generates production order directly?.

Help

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi Sir,

Since the sysytem is creating a production diorectly after running MRP, please check the SPK, have you maintained as %2 or checked the strategy in MRP-3, have you manintained as 82.

Regards

Bhupendra Singh