No stock for FERT after CO11n

Hello All

We have two raw materials belonging to finished product . During the confirmation (CO11N) , both the operations are confirmed . But system does not shows any stock in the warehouse .

The production order does not shows the status as confirmed . Please guide as to what could be the possible reasons for the same . Many thanks in advance.

Kind regards



Dear Ayaz,

Check the control key assigned in the last operation whether automatic goods reciept is included or else check whether any

production scheduling profile with autmatic goods reciept has been assigned in the work scheduling view of the material


In case if there is no automatic goods reciept allowed either through control key or else using prod.scheduling profile then you

have to first peform or post GR using MIGO or else MB31 for the order.However before this you can confirm whether GR has

been made or not using the status or else in CO03,menu->goto->documented goods movement,check whether are you able

to see any movement posted for 101.

Check and revert