cancel
Showing results for 
Search instead for 
Did you mean: 

Report of future events

Former Member
0 Kudos

Hello experts,

I have the following issue, we need a Reporting to allow display based on a range of dates (The report, has to see like /SAPTRX/EE_OVD_LIST, i mean a list), taking the expected date of the event, those events that fall within that range, to have visibility into what activities should be executed in the period of time.

I mean by example, we want to see the events (in a list mode) next to happen between june 1st and july 10th of 2011.

I analyzed the following transactions without obtaining the expected result:

u2022 /SAPTRX/EH_LIST.

u2022 /SAPTRX/EH_SET.

u2022 /SAPTRX/EH_LIST_STAT.

u2022 /SAPTRX/EH_LAST_EVT.

u2022 /SAPTRX/EE_OVD_LIST.

u2022 /SAPTRX/EE_MON.

u2022 /SAPTRX/EVM_STATUS.

u2022 /SAPTRX/ER_MS_LIST.

u2022 /SAPTRX/LOCKED_PROC.

u2022 /SAPTRX/LOCKED_PSET.

u2022 /SAPTRX/EMJOBS.

u2022 /SAPTRX/ASAPLOG.

u2022 /SAPTRX/CONS_CHECK.

Which transaction can be used to achieve this goal?

Thanks and best regards,

Juliá

Accepted Solutions (1)

Accepted Solutions (1)

former_member190756
Active Contributor
0 Kudos

Hello Julian,

you could create Selection profile for the EM Web UI. As basis for the configured fields you can use

EVENT EXPECTED DATE

EVENT EXPECTED TIME

EVENT EXPECTED TIMEZONE

(transaction /SAPTRX/UCCF).

Best regards,

Steffen

Answers (0)