My issue is following. I am conducting two-step movement (warehouse-warehouse). I have created, let me say, three movement documents (Operation: out of stock. Other. Kind of motion 313). The material is in the movable reserve (stock). Next, I need to take all the materials of a roaming reserve by one movement document with reference to all three movement documents (Operation: Take to the warehouse. Other. Kind of motion 315). How to do it? And is it anyway possible?
Thanks for your answers.
Hi,
If you are referring storage location to storage lacation stock transfer vide 313, then total stock in Transfer (SLoc) type can be transfer back with 315 movement types.
Thanks
Dinabandhu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
out of stock. Other. Kind of motion 313 --> you specified three movement documents. can you suggest the other two movements? i see one of them being 313.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Since all three materials are currently in stock-in-transfer, you should be able to receive all three in single MIGO_TR (place into storage) with 315 transaction. In the transaction, close the header tab which will expand the item overview with multiple entries and you can enter all three materials with the destination information. Once you save it, you'll get a single material document referencing these 3 placements.