PR Release Strategy-Characteristic Z_GSWRT must be linked with CEBAN-GFWRT

muhammed_imraan
Explorer
0 Kudos

Dear Experts,

I did a simple config for PR Release strategy. using Plant(Z_WERKS) and Item values(Z_GSWRT )

chose overall PR Release. During simulate release

the second level release its not able to simulate and it says check Prerequistie for second level

Can somebody expain why the system is giving me this below message.

Characteristic Z_GSWRT must be linked with CEBAN-GFWRT

Message no. ME_RELCHK056

Thank you

Imraan

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

CEBAN-GSWRT is used for Item-wise Release Strategy while CEBAN-GFWRT is used for Overall Release Strategy. You have to create two different release classes (one for overall release and other for item-wise release). Only either CEBAN-GFWRT or CEBAN-GSWRT is assigned to each release class. This release class will be then assigned to respective release group.

muhammed_imraan
Explorer
0 Kudos

Thanks for the solution that helped me to understand PR Release much better.

Values: Plant (WERKS)& Itemvalue (GSWRT) & Now I created (GFWRT) For another class for Overall PR release.

In my PR Release strategy with 2 levels I have these below things:

Rel Groups : 1 Group with name AA

Rel Codes: For AA is A1, For another AA is A2.

Rel Indicator: nothing is selected, am not sure what to do in this step.

Rel Strategy : For AA is S1, For another AA is S2.

I created class Z_GFWRT but am not sure which group I should assign it AA or I have to create another new group for Overall release.

After I checked the release strategy the system is giving me this below message.

No release group exists

Message no. ME_RELCHK014

Please can you walkme through in this process. This is first time I am creating a PR Release.

Thank you Very Much

Imraan