on 05-30-2011 9:26 AM
Dear Experts,
I did a simple config for PR Release strategy. using Plant(Z_WERKS) and Item values(Z_GSWRT )
chose overall PR Release. During simulate release
the second level release its not able to simulate and it says check Prerequistie for second level
Can somebody expain why the system is giving me this below message.
Characteristic Z_GSWRT must be linked with CEBAN-GFWRT
Message no. ME_RELCHK056
Thank you
Imraan
CEBAN-GSWRT is used for Item-wise Release Strategy while CEBAN-GFWRT is used for Overall Release Strategy. You have to create two different release classes (one for overall release and other for item-wise release). Only either CEBAN-GFWRT or CEBAN-GSWRT is assigned to each release class. This release class will be then assigned to respective release group.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for the solution that helped me to understand PR Release much better.
Values: Plant (WERKS)& Itemvalue (GSWRT) & Now I created (GFWRT) For another class for Overall PR release.
In my PR Release strategy with 2 levels I have these below things:
Rel Groups : 1 Group with name AA
Rel Codes: For AA is A1, For another AA is A2.
Rel Indicator: nothing is selected, am not sure what to do in this step.
Rel Strategy : For AA is S1, For another AA is S2.
I created class Z_GFWRT but am not sure which group I should assign it AA or I have to create another new group for Overall release.
After I checked the release strategy the system is giving me this below message.
No release group exists
Message no. ME_RELCHK014
Please can you walkme through in this process. This is first time I am creating a PR Release.
Thank you Very Much
Imraan
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.