I am in 5th stage ( preprocessing ) ,
MAIN_SHDIMP/SUBMOD_SHDIMP/SHADOW_IMPORT_INC this phase is running last 12 hrs continuously but logs generation stopped last 5 hrs onwards, there is no CPU utilization also.
OS : Windows 2003 server
DB. DB2 9.7 FP3
ERP 6 EHP4 upgrading.
My question is ,
Can I stop and restart this ehpi tool?
Shadows instance is needs to run this phase? because shadows instance is stopped.
Thanks
Siva
Hi,
This phase usually takes long time to finish. So, you should wait for some more time.
What is the number of R3trans and background processes you have chosen in upgrade.
Thanks
Sunny
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi, Siva
Could tell me please how could you decide this problem? I am in the same situation.
I do the upgrade of our system upto EHP6 and the upgrade process is hanging at the phase MAIN_SHDIMP/SUBMOD_SHDIMP/SHADOW_IMPORT_INC more 24 hours.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi all,
Same here, same step MAIN_SHDIMP/SUBMOD_SHDIMP/SHADOW_IMPORT_INC, over 24 hours, no CPU nor memory utilization, no logs activity except Phases.log which resides in SUM\abap\log.
I have one r3trans and one tp.exe but it appears as if they are not doing anything at all.
Shadow instance is down (grey), no activity what so ever in SM50 not ST04.
I have no problem with waiting even a week - but my question is will i see results eventually ?
Is this normal for this phase to last days ?
Regards
Adi J.
User | Count |
---|---|
81 | |
25 | |
12 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.