on 05-25-2011 2:38 PM
Hi
Facing a scenario where we have the batch determination made in delivery based on SLED, picking based on FIFO (stock removal for storage type = F). Now the users also wants a functionality where the SAP 4.7 prioritizes full pallets before broken pallets.
For example:
Material 123456, batch XXX is in 3 different bins: A1 (100EA), A2 (100EA) and A3 (50EA, half pallet). 1 pallet=100EA.
Picking requirement=200. The quants all have the same GR date in the bins.
How do we prevent the system to go break any pallet? What we DO NOT want the system to do is to go pick A1 (100EA) and then 50EA from A2 and 50EA from A3, meaning we break the full pallet in bin A2.
What we DO want is the system to suggest picking from A1 (100EA = Full pallet) + A2 (100 EA = Full pallet).
Any suggestions? What I am looking for is config and master data settings tips.
Thanks in advance,
Lars
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
This message was moderated.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Lars,
Two conflicting scenario / requirements. FIFO and to identify full and partial pallet while removal. I think it can only be achive thru' stock removal user exit MWMTO004.
Reg,
Sudhir
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.