cancel
Showing results for 
Search instead for 
Did you mean: 

Dynamic modification rule

muhamed_faisal
Active Participant
0 Kudos

Sir,

As working with dynamic modification rule , we know that next material going to gr is a skip lot,

So for coming lot i want system do not skip the lot , i want system to create a inspection lot

After this lot agian i want to go as per DMR setting

wether it is possible

Faisal

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Have you checked T code QDL2 .

Tries to change the level.

muhamed_faisal
Active Participant
0 Kudos

Sir,

For the transaction QDL2 can you pls tell me how we can change the level

Faisal

kaushik_choudhury2
Active Contributor
0 Kudos

Hello Faisal,

Change the Inspection Stage for Next Inspection . This inspection stage is the basis for the next inspection that is related to this quality level.

Thanks

Kaushik

Former Member
0 Kudos

Go to QDl2->n current data->check next stage--->if its skip then change to inspection( like 10 -initial)

once you done with inspection stage change it again to skip ( like 20)

i hope you will explore

Answers (1)

Answers (1)

former_member42743
Active Contributor
0 Kudos

I - Change the status of the new inspection plan and use the old one.

2 - edit the plan and remove the DMR until after the next receitp

3 - The inspection lot is always still created. Just use the skip lot inspeciton as you would a normal inspection lot. Just make sure you change at a least one resutl before teh skip lot batch job has a chance to process the lot.

FF