In my in house production having with three operation
010 in house operation
020 external operation
030 in house final
i want to create a inspection lot after confirming second operation how to handle this scenario
if I go for 03 type inspection type it is creating with production order itself just I want to know is it possible to create after confirmation
With this external operation confirmation there is no gr is happening same material is going and same material only coming inside, with some work on the material
pls advice me
Faisal
Not possible in SAP standard for creation an inspection lot automatically when order confirmed if there is no GR.
You can check process for an inspection lot creation manually at transaction QA01.
Regards
Luke
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Operation wise creation of inspection lot is not possible that too for 03 inspection type.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.