Skip to Content

Archived discussions are read-only. Learn more about SAP Q&A

Running report in background job without variant

Hi Gurus,

We developed one report. In that report we have creation date field as select-option in the selection screen. But when we are creating variant there is no option for the default values which are coming from the report.

Ex: Creation date 01.05.2011 to 23.05.2011 (i.e. sy-datum).

We have n number of POs in our production system. So we are taking POs created after May 1st 2011(creation date-low it should be constant) and creation date-high should be sy-datum.

But when I am saving it as varaint, I am not able to get the exact dates in the field.

1. Is it necessary to run a report with varaint in background?

2. If variant is mandatory to run report in background, then how to get creation date-low as 01.05.2011 and date-high as sy-datum.

Kindly help me to sort out the problem facing.

Thanks,

Kiran.

Former Member
Not what you were looking for? View more on this topic or Ask a question