on 05-21-2011 7:46 PM
Dear experts,
our company uses the following scenario:
We produce material A.
We order material B with a subcontracting purchase order at a vendor and provide material A to our vendor.
Material B is received back.
The BOM of material B contains material A.
I created a new inspection type X and assigned it to origin 01.
Task list usage is 53.
I maintained the inspection type in material master, activated it and set it as preferred.
I don' t want to use the quality inspection stock.
Quality info record is created and inspection control: Inspection is active independant of vendor control.
Here is the problem. When I post a goods receipt for material B the system does not create an inspection lot.
Actually I have no clue why.
Any suggestions?
Thanks in advance.
Regards
Marc
Problem was splved internally.
Setup in QM was ok. In our test scenario the goods receipt was posted by a BAPI in the background.
After posting the goods receipt manually with MIGO we found an error in the cost allocation which was corrected.
Thanks for your help.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
First of all
Activate 01 in material master of Material B & not A as GR is created against B .Make sure that Inspection type active is Ticked.
WHich inspection type you are using? What is a reason to have Quality Info record?
Also check material document & MMBE what is stock type & where stock goes after GR.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.