Character Depended Planning in APO

Dear Experts

Please help me..

We have created one configurable material in ECC with 3 lines of BOM which are having 3 types of object dependency

Material Code : XYZ (Fert) and ABC (ROH)

To produce XYZ - 100 PC i need ABC as per following

1. If sale order of XYZ qty is less than 100

ABC require 120 PC

2. If sale order of XYZ qty greater than 101 and less than 500

ABC require 115 PC

3. If sale order of XYZ qty greater than 501 and less than 100

ABC require 110 PC

We have shifted PDS to APO, afer CTM plannig Run system has created planned order without considering Object dependency

This is working in ECC fine but in APO OD is not considered

B/R

Dharmesh Soni