on 05-20-2011 2:25 AM
Hi All,
I am facing an issue with reorder point planning storage location MRP , the details are as below
Stock Qty.on 05/13/11 - 4 Nos
Qty Issued on 05/13/11 - 1 No
Reorder Level Qty - 4
Replenishment Qty is - 3
Sloc MRP indicator is -2
MRP Type PD
Lot size -EX
Max Lot Size -0
Min lot Size -0
MRP Run on 05/14/11 Created 2 Purchase requisitions of Qty -3 each
It should create only one proposal for 3 Qty.
What could be the possible reason?
Thanks
Diwakar
I assume that the stock is at your storage location in question.
The first PR is for stock transfer request between storage location. The material stock after issued (3) is below reorder point (4) therefore the replenishment is required. The STR with replenish qty is created equal to replenishment qty (3). At plant level you will see the negative demand of the STR, therefore, the PR is initiated to procure material in.
Hope it clarifies your query.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
We have been using this scenario for long, whenever stock falls below reorder level system creates one procurement proposal
to excced the reorder level based on replenishment quantity , so there should not be two purchase requsitions in this case
and this happened during weekend MRP run for the first time
Thanks
Diwakar
Thanks, i checked in MD21 the planning file entry is not eliminited after first job run , and second job run also
Could that be the cause for again creating procurement proposal , infact for some of the material the entry still exisits in planning file
Why system is not removing the entries after MRP run , and is it possible MRP to generate proposal again based on this entry?
I am also looking at OMDU this job is not planned using OMDU i guess its put in process through SM36 could that be the reason?
Thanks
Diwakar
Hello,
We have the same exact issue. Our set up is the same. MRP for the weekdays are not duplicating, only for the weekend.
I think it has to do with how the planning file entries are being reset. Any ideas?
Cheers,
Nguyen
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Diwaka
Stock Qty.on 05/13/11 - 4 Nos
Qty Issued on 05/13/11 - 1 No
Reorder Level Qty - 4
Replenishment Qty is - 3
Sloc MRP indicator is -2
MRP Type PD
Lot size -EX
Max Lot Size -0
Min lot Size -0
MRP Run on 05/14/11 Created 2 Purchase requisitions of Qty -3 each
It should create only one proposal for 3 Qty.
What could be the possible reason?
As mentioned by you current stock is 4 -1 = 3 is that available on the same storage location which is excluded from MRP?
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
99 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.