Kanban containers

Hi we have the following issue in Kanban

We have a batch managed material (Material A) we want to use this kanban process.

The Kanban Control Cycle for Material A has 2 containers.

Material A has batch 1 and batch 2 in the warehouse.

We do not want to mix batch 1 and batch 2 in the same container.

When we request Material A we do not want to mix batches in containers.

Is this possible?

In tests when there is not enough qty of Batch 1 to fill container 1 SAP takes batch 2. This is not allowed here.

Thanks