Hi All,
I have a requirement in the SAP-SRM system, when the shopper is going to confirm the PO ,need to check, is that particular PO document number is locked in the backend R/3 system .If it is locked I need to rise an error message .
Please let me know how I can proceed.
Thank you.
Hello,
the system will check in FM BBP_CF_ASSIGNMENT_BACKEND whether the PO to which you want to post a confirmation is still in transfer, and issues a message. Furthermore in extended classic scenario the PO cannot be changed in ECC.
If you are using classic scenario then I´m very sure that during the META call to the backend for reading the PO, a lock from ECC side will be detected.
Regards
Michael