Hi All,
I would like to know,what configuration I have to maintain so that I can see Subcontracting check when creating Maintenance order,I mean to say when we maintain PM02 control key the popup comes where we maintain details of cost element and material group etc there we can have subcon check.how to get that check,as in my config I am not getting that check.
I need some enlightment for fleet tyre issuance process,I created tyre as equipment using serial number profile,now all the tyre are in stock,how to map installing/dismantling process,i want in terms of stock.how to GR while doing GR i want to use same serial numb how it can be made possible.
Hello,
You have to installed DIMP 6.0, activated the business function Refurbishment and Subcontracting (LOG_EAM_ROTSUB) and Serial Numbers in Purchasing (LOG_MM_SERNO) .
Then In configuration-->OICO Configured below MPI
For S-->Check Box MP VEND, MP CUST Must Unchecked & Check Box A&D MP should be Checked, Check BOX Deferred should be unchecked
For X--> Check Box MP VEND Must be Checked, MP CUST Must Unchecked & Check Box A&D MP should be Checked, Check BOX Deferred should be unchecked
Also configured control Key PM02
Regards,
Rakesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Kapildev,
Its under Component Tab,select General data,in the General data there is Mat. Prov. Ind.(MPI).
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI Maheswaran,
I checked,but I am not getting the check indicator when populating subcontracting popup using Control key PM02.
MPI is grayed when creating Maintenance order.Suggest me what other details need to be maintained.
Thanks
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
MPI will be active only when
Material provided by a vendor
This indicator controls MRP. Only maintain this indicator for a material component if the material master record of the header
material supports subcontracting (Special procurement field). The special procurement key for subcontracting means that all
components of the BOM are provided free of charge to a subcontractor for further processing. The items are copied to a subcontract order.
In Control Key, you have to select the option as Externally Processed Operation.
In the given SAP Help link, Under MRO Processing for Maintenance Order, check all the Pre-requisites.
Also in OS12, check the configuration.
Regards,
Maheswaran.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
102 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.