Hi All,

I got a unresolved problem.

Strategy Plan with horizont 0% and several packs:

Package 1 : 1Month; Package 2: 3Month. Pack 2 suppress Pack 1.

In SAP, if we start the plan, with date 01/05/2011, the scheduling would be :

Planned date______Call date

01/06/2011_______________ Pack 1

01/07/2011______01/06/2011 Pack 1

01/08/2011______01/07/2011 Pack 2

01/09/2011______01/08/2011 Pack 1

01/10/2011______01/09/2011 Pack 1

01/11/2011______01/10/2011 Pack 2

01/12/2011______01/11/2011 Pack 1

01/01/2012______01/12/2011 Pack 1

however we want to:

Planned date______Call date

01/06/2011_______________ Pack 1

01/07/2011______01/06/2011 Pack 1

01/08/2011______01/05/2011 Pack 2

01/09/2011______01/08/2011 Pack 1

01/10/2011______01/09/2011 Pack 1

01/11/2011______01/07/2011 Pack 2

01/12/2011______01/11/2011 Pack 1

01/01/2012______01/12/2011 Pack 1

How can I do this in SAP in strategy plan with several packs?

Thanks.

BR, Alex.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

This is standard functionality as Maintenance Plan will consider the the call date based on the smalest package.

So it would be 1 month difference but not 3 months as per your requirement.