Hi Gurus

We have SCM 4.10. When we are taking SNP run in /SAPAPO/SNP01 with Product as in put and selecting Network Heuristic as option we are getting strange out put. Please consider bellow case.

Input for background run

Product A, B, C and network Heu

PPM containing following materials

A -> X-1, Y-1, Z-1

B-> X-1, Y-1

C-> Y-1, Z-1

Demand for A, B, C as 1 each

SNP Log after run shows

Planned orders

A-> 1, B-> 1, C-> 1, X-> 6, Y-> 9 & Z-6 (its double for X, 3 times for Y and double for Y)

In product View i can see

A-> 1, B-> 1, C-> 1, X-> 2, Y-> 3 & Z-> 2

In R/3 I can see

A-> 1, B-> 1, C-> 1, X-> 6, Y-> 9 & Z-6 (its double for X, 3 times for Y and double for Y)

It is observed that when SNP Heuristics is run at network level for multiple materials in single run, components which are common in the assemblies for which run was taken gets duplicated.

If one assembly is executed at a time every thing goes fine, but is multiple products are used in same run this happens.

Please help

Regards

Abhishek Rai

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Hi,

Try running low level code determination before SNP heuristics run always .

Thanks,