Transfering the Cost from Cost center to PM Work order

Hi all,

We have a scenario.

we are doing material consumption from storage locaiton to a cost center using 201.

when the material requirement comes from work order, we are doing reverse consumption posting from Cost center to storage location using 202. and then issue the material to work order using 261.

Is there any way, that we can move the cost directly from cost center to work order (skipping the storage location in between).

Thanks in advance.