Dear Experts,
I want to know when iam inside maintenance order if the components have cost or not when i go to logs i find the cost log empty and when i run cost determination if the material has no cost it terminates me , what if i have 3 or 4 components in the order and 3 have cost and one has not so it will terminates the total order my client wants to know from inside the order which have cost and which have not ,
Very much thanks in advance
Hi
While determining the cost if any error is there ,system will prompt that if you save the order the log will get empty ,so you can cancel the option and check the cost determination log for further correction
regards
thyagarajan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
What i achieved till now is when i enter the materials in components tab ( without the requirment quantity) then i click cost determination then i go to GOTOLOGSCOST DETERMINATION i find the unpriced parts and this is very close to my client requirement but he want to do the same also by entering the requirement quantity in the components,
any idea?
Thanks
Hi,
if i entered the quantity in the components and press on cost determination icon it will give me log with the termination message and when opening it i will find the error of no price could be determined then when back to order again it gets me out of the order,
But without quantity in components and by pressing cost determination icon it will get me message to see the log and i press GOTO-LOGS-COST DET. and i c the error messages without any termination messages
Thank you