Hi SAP Guru

I have an issue in my WMS setup.

I currently assigned Storage Type XXX for palletization. PUTAWAY STRAT : P

Mixed Storage : X

Addition to Stock : X

In the master Data setup i have input the palletization information already under SUT IP.

For Material X = 100 GM for each pallet ( IP)

For Material Y = 200 GM for each pallet ( IP)

For each storage bin i have dividied into 4 sections ( or quants )

so bascially naming convention will be like this

C11000 / 1

C11000 / 2

C11000 / 3

C11000 / 4

Now the issue is, when I create a TO for material X ( 10GM) , the system will automatically propose the bin.

The system will assign the material to bin C11000 / 1

If i create another TO for material X (5GM) different batch, the system will automatically propose the bin

The system will assign material X to bin C11000 / 2.

IF i create TO for material Y ( 10GM )

The system will assign material Y to bin C11000 / 3.

Should the system fill in C11000 / 1 before moving on to C11000 / 2 and so on?