on 05-13-2011 12:52 PM
Hi,
I want to delete the Inspection plan from data base (tables) in order to change the Material UOM.
I am not able to delete the Inspection plan from QSR6 transaction code, system is throwing message that the task list is still used in Inspection lots. But when I checked Inspection lot, all lots have the status u201CUD ICCOu201C so, no open lots.
Could anybody suggest me how to change the material UOM?
Regards,
Raj
Hi,
Pl. go to MM02 and include Alternate UOM in the Additional Data. Probably, that should solve your problem. You don't have to delete the existing Inspn plan. You can still use it with the changed UOM. Pl. try and let us know. Regards, Krishna
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You don't have to delete the Inspection plan.Put deletion Indicator at the task list header.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Raj,
I think it is not possible to change UOM if the few transactions happened. There is a strong logical reason for this.
1. As you know every lot has UOM of the material. In background several LIS get updated with this UOM.
2. A single material cannot have partial data with 1 unit and partial in different unit.
3. Once the lot is created with certain unit, later it is not possible and not logical to change it.
You can change UOM of material only if no material movement has occurred, No open PO, no task list exists. I would suggest to create different material code for this.
Regards,
Anand Rao
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.