cancel
Showing results for 
Search instead for 
Did you mean: 

WIP Production Planning

Former Member
0 Kudos

Dear All,

I am calculating WIP with transaction code KKAO, I am getting a error...

1) Customizing for WIP calculation: maintain status DLV and TECO

2) Create valuation method in CO area BP01 version YG1 RA key 000002

Please Suggest...

Regards,

Pawan Shetty

Accepted Solutions (0)

Answers (3)

Answers (3)

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

Please refer this link,

Former Member
0 Kudos

Hi:

1; Customizing for WIP calculation: maintain status DLV and TECO

Make sure the order has the statys DLV (all materials are deliverd to their respective locations)

2: You must maintain Valuation methods for WIP calculations

These methods creates a link between controlling area, the results analysis key, the results analysis version, and the system status.

Please ask your CO guy to maintain these links. Your problem will be fixed.

Pavan

Former Member
0 Kudos

This is a CO related query, so get in touch with your CO consultant to ensure all relevant setups are done. Alternatively you may search the CO forum to get the details.