will one maintenance order generates two PRs

Former Member
0 Kudos

Hi gurus,

i have a requirement which needs to generate two PR numbers in a particular maintenance order which contains two operations,

one operation needs components having no stock and another operation needs extenal service. Can we get two PRs for this order?

Thanks in advance

R.D.I

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi ,

IF you want to have only 02 PRs on the whole , one for Non-stock , one for External operation .. then try using BADI : IWO1_PREQ_BADI -- BAdI for Manipulation of P.Reqs from Orders + Networks , In SE18 check method DECISION_COLL_PREQ : Decide on Collective Purch. Req. Item or New Purch. Req.

regards

pushpa

former_member187991
Active Contributor
0 Kudos

Hi

You can generate individual PR for each operation ,in IMG if collective PR is not marked then system will generate separate PR for each external operation and external material procurement

regards

thyagarajan

Former Member
0 Kudos

hi,

I have tried by removing tick in collective PR check box.But i could not able to get 2 PRs. ione PR generated for non stock components but for second operation which needs external service system message is that

"Item category D not allowed for document type ZNB".

can we get it without using any User exit.

Thanks &regards

R.D.I

former_member187991
Active Contributor
0 Kudos

HI

Can you explain what exactly you are trying to do

regards

thyagarajan

Former Member
0 Kudos

hi,

I have a maintenance order contains two operations out of which one operation needs some spares need to be procured using Item category as N.

Second operation should be done by external manpower which needs to be generates service PR.

Will it possible to generate both PRs for this order using standard SAP.

Thanks & regards

R.D.I

former_member187991
Active Contributor
0 Kudos

Hi

In standard you can create 2 PR if collective requisition is un marked, if you mark the same system creates one PR with 2 line item as external operation and material

regards

thygarajan

Former Member
0 Kudos

Dear Thyagarajan,

Issue resolved & closed

Thanks to all

Regards

R.D.I

Former Member
0 Kudos

Hi,

Can u please provide SPRO path to mark collective PR for order.

Regards,

Sudhakar

Former Member
0 Kudos

thanks

thread closed.