HI SAP Gurus,

I need some help!

If i create a refurbishment order (pm04) for a material that is going to be repaired, it creates a reservation for that material. If i look at transaction MD04, it shows the material as a plus and not a minus. If i order material on another order it makes it a minus.

Even if i order spares on the PM04, this works fine, but not the material that the PM04 is created against.

The problem this causes is for the SCM guys when MRP runs. I checked if there is settings on spro, but found nothing.

Is this SAP standard?

Please help.

Thanks

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Thanks,

I thought so. I noticed that if you do a PM04, it does an order and a reservation on MD04. Other orders just do a reservation.

If the material is issued to the PM04, the reservation gets removed from MD04. When i do a goods receipt for the repaired material, the order disappears from MD04.

I thought it might be settings in the PM04.

Thanks

former_member187991
Active Contributor
0 Kudos

Hi

I think it is standard since the material issued for refurbishment will be back to warehouse,hence system will wait for material to return hence it displays in +ve sign

regards