on 05-12-2011 11:14 AM
Dear Experts,
I am integrating the r3 system to the charm process.
I have created the maintainenace project in SOLAR_PROJECT_ADMIN
gave tha logiccal component(TMS is configured ( DEV--> QA --> PRD) .
Now when i create teh img project for this it is throwing the error as below.
*S:No authorization to:000 on as a trusted system (Trusted RC=1).
Message no. No authorization to000
-
\I have all the roles to my user id mapped
Trusted rfc's
S_RFC
S_RFCacl
etc......
What might be the error................??
my need to be create in the clients 000 for which i am omplementing the charm..........??
What are the roles should be given in 000 client.
Regards,
Umesh
jsumesh85 at gmail
hey umesh,
Please ensure that you have the trusted system access'role in both Solman system and the satellite systems (D, Q, P), especially D. Also ensure that you have all these systems added in that role for RFC authorization. And in the trusted RFC, ensure that the "Current User" is selected under the logon tab.
And regarding the client 000,the RFCs are by default created to that client.
Please let me know if you still face any issues.
Regards,
sneha.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Umesh,
Please confirm your problem by as issue with the trusted system, check the link below
[Trouble trusted system|http://help.sap.com/saphelp_nw04/helpdata/en/8b/0010519daef443ab06d38d7ade26f4/content.htm]
No authorization to log on as a trusted system (trusted RC = <0 1 2 3>).
Here, the trusted return codes ( = 0, 1, 2 or 3 ) have the following meanings:
1 Calling system is not a trusted system, or security
ID for the system is invalid.
Solution: Create (again) the trusted system (see above).
as of in trusted system, you supposed to get the same user in both the systemm witht the respected access like S_RFCACL.
complete explanation of trusted RFCs is in note 128447.Please follow the note
Thanks
Jansi
Hi Umesh,
Are you selecting the devlopment role while creating project IMG .
Now
1. check if in SM59 you can do remote logon in your ecc dev system
2. once this is done you also need S_PROJECT authorization to create an IMG project in ecc dev system
Hope this solves ur problem
Regards
Prakhar
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Umesh,
The S_RFC, S_RFCACL authorizations for your user on the systems should be enough to avoid the error.
But you need to check the corresponding RFCs between the systems and if the user provided in those RFCs have the above authorizations as well.
Regards,
Srikishan
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Experts,
Any reply on the above.
Regards,
Umesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
10 | |
10 | |
9 | |
6 | |
6 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.