Reg:Production Order confirmation

Former Member
0 Kudos

I have to do One operation

1) Created one workcenter -ABC with

Setup time=10min

Machine time=10min

Labour time=10min

In kp26 i have maitained price for setup,machine,labour time

NOw for that operation i have cretad a production order with qty=100.Nos

My actual values are

Setup time=20min for 1 piece

machine time=20min for 1 piece

Labour time=40min for 1 piece

In Co11n to confirm the production order

Yeild=100,

and for setup time,machinetime,labour time

1)should i enter actual values or the values mentioned in the workcenter

2) should i enter for 100 nos or for 1 number

Regards,

Raj

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi,

The times maintined in the routing are the planned values, which may vary in actual. some times considerably.

When you are confirming the order it is recommended that you enter only actual values. These are directly proportional to costing.

1)should i enter actual values or the values mentioned in the workcenter

If your actual values are 20min, 20 min and 40 min, then maintain those values during confirmaton. But by default the system proposes planned values only, which you can change during confirmation.

2) should i enter for 100 nos or for 1 number.

you can maintain the number of quantities you want to confirm, there is no rule that you have to maintain order qty only. but make sure you maintiain actual time taken for producing those materials are maintained during comfirmation.

In standard SAP

setup time , machine time and labor time are considred for cost calculations.

labor time is not considered for scheduling.

Offcourse it depends on your need and accordingly you can define your own formulae for calculation.

Pavan

Former Member
0 Kudos

Hi,

1)should i enter actual values or the values mentioned in the workcenter.

Values you enterd in workcenter is probably a planning which may vary..so you have to go for

actual values(u need to change the values which comes automatically if it does not satisfy your needs.

2) should i enter for 100 nos or for 1 number

the field "yield" signifies the operation cost on being produced material..ok.so whatever amount of material

that had been processed under this operation,you need to put there that yield value only n the corresponding

operation/activity amount n do the GI if u need.

so in above case put yoeld 100.

Please reply if any question

Regards,

DeJoy

Edited by: de joy on May 11, 2011 6:56 PM

Former Member
0 Kudos

OK

Yield i will enter as 100

But setup time,Machine Time,Labour time should be entered for 100Nos or for 1No

Regards,

Raj

Former Member
0 Kudos

Hi Raj,

you are entering the yeild as 100 qty, tht means the values for setup, Machine & Labour time should be entered for 100 qtys.

else if u enter the values for 1 qty system wil consider it for 100 qty (as yeild=100 qty).

Rgrds,

Kapil