Schedule line date calculation setting

Former Member
0 Kudos

Hi,

We have material master with GR processing time in Purchasing view as 5 days and planned deluvery lead time in in MRP 2 as 20 days the availibilit check we are using is 02 in present case stock is zero but when we are creating the sales order the system is taking the schedule line date as todays date only even the stock is zero open production order qty. is very less than sale sorder qty. so what settign required for this such that when user create the sales order if material is not available the schedile line date shouldbe GR time + planned delivery lead time.

regards,

zafar

Accepted Solutions (0)

Answers (3)

Answers (3)

Former Member
0 Kudos

This message was moderated.

amitbakshi3
Active Participant
0 Kudos

Hi Zafar,

When you perform the Availability check in Sales order the system considers current date as the status, which is SAP standard.

What I have understood is that you are producing this Material in your plant.

Please share more info about the item category used is Stock to stock or Make to order. What MRP procedure you are running for this material (VB or VM) for Planned order / Production time and if you have maintained any reorder level and the safety stock to help you plan out the correct days of ATP.

Best regards,

Amit Bakshi

Former Member
0 Kudos

close

former_member218067
Active Contributor
0 Kudos

Hi,

The checking group + checking rule determine how the availability check is to be performed.

The checking group determines whether and how the system checks the stock availability and generates requirements for material planning. The checking group defines what type of requirements will be passed on i.e. summarized requirements (daily/weekly) or individual requirements for each sales order.for more info refer to the link http://sapfunctional.com/SD/AvailabilityCheckConfiguration.htm

Thanks

Diwakar