We are currently in SRM 5.0. HR integration is currently active but we have a location that we would like to roll out SRM to that is not in our ECC HR Org structure. Is it possible to manually add Org units and users for a location in the interim until the location moves into HR in ECC?

Any advice/help would be great.

Thanks

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

You can.. But only think I doubted is once the new unit get moved to ECC HR, I suspect some overwrite issues..

Thanks!!

Bharath

Former Member
0 Kudos

Does anyone have any documentation on how this might be done and things to consider when the HR org is implemented in the future? If we have an interim org unit in SRM and then we bring over the HR org structure in the future, is there a way to merge the users together or do we lose the history of the interim users/structure?