What is the concept of automatic User decision concept in QM

If i want to bring this concept what are the setting required

Please give me a detail answer

Thanks in advance

Faisal

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

The concept of Auto UD is

When you do not want manually go to QA32/QA11 & to carry out Usage decision every time ,then you can make setting for "Auto Usage Decision"

I QM view inspection type there is provision of "Auto UD" & "SKip"

Generally AUto UD is done for the lot

1.for which result recording done & all char has status 5-->closed & completed.

2.All char as "Skipped'

for auto UD to set in background you need to

1.for this plz. check in spro>Quality Management>Basic Settings>Maintain Settings at Plant Level>select plant>inslot completion>automatic usage decision --> Enter delay time for skip lot.

2.In QA16 create the variant & in QA17 run the variant with schedule.

or

2.Use QA10 & make variant & Run Variant through SM37

I hope this will help