cancel
Showing results for 
Search instead for 
Did you mean: 

Safety stock not considering at the time of Heuristics run

former_member1013
Participant
0 Kudos

Hi All

At the time of Heuristics run the safety stock maintained at that location is not taken into consideration. That means when we have enough stock to cover demand system still demands from the source location.

What settings needs to be checked in this scenario??

At the same time when we remove ss stk from the same location Heuristics giving good results.

We run location heuristics.

Do you come across such scenario???

Thanks

Best Regards,

Sanjay

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

What is the safety stock method that you're using?

former_member1013
Participant
0 Kudos

Hi Sanjeev,

My safety stock method is MM.

Thanks

Former Member
0 Kudos

Hi Sanjay,

In case you are using safety stock method as MB/MZ/MM, you need to use planning book 9ASNP_SSP and data view SAFETY. Planning run would consider safety stock accordingly.

Pls try and check if it works.

Regards

Manotosh