on 04-22-2011 8:23 AM
Dear All,
Inspection lot generate from good reciept type 4 scenario is like
Process Order Quantity 1000
user have done to separate GR of 100 Each now from that Goods Receipt two quality lot of origin type 4 and lot size 100 each generated now user asked me to change the second lot quantity change to 900 instead of 100 so can we change???user is saying me that because the QC inspector is not agree to done inspection of third lot so if possible than pls tell
Regards,
Murari Shah
Material master > QM view > Inspection setup > Detailed information on inspection type '04'
Check 'Control inspection lot' field and refer F1 help.
1) If you set the value 'X', only one inspection lot is created during the first GR for production order.
Then the "actual" inspection lot quantity will be increased in same inspection lot when further GR for same production order.
The inspection lot quantity will not be changed but is same with first GR quantity.
2) If you set the value 'Y', only one inspection lot is created when a production order is released.
Then the "actual" inspection lot quantity will be increased in same inspection lot when further GR for same production order.
The inspection lot quantity will not be changed but is same with production order quantity.
Regards
Luke
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear Luke,.
Can you pls explain me in detail ? Scenario that i describe here is in rare case
Regards,
Murari Shah
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
IF GR for rest of 900 qty not created & UD of the existing lot has not taken then you can use QAC1 t code
This will automatically creates 101 mvt in background.........
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
It is impossible. You cannot change the inspection lot quantity.
The inspection lot quantity should be same with GR quantity.
Another option is that you implement lot summary using inspeciton lot control function of material master.
If you want to know more in detail, search 'lot summary' in SDN.
Regards
Luke
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
11 | |
10 | |
6 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.