Hi Gurus,
can anyone tell me how to populate the Capacity Reqmts field in the PPDS PDS (activity>mode>capreq, field CAPORG)?
Is there any documentation on use of PRTs in APO?
thanks a lot,
Pablo
Hi,
The capacity requirement of an activity describes how much of the productive time and the capacity of a resource is required to process the activity and is determined through the net duration and the corresponding resource consumption of the activity.
The system calculates the net duration, the resource consumption and thus the capacity requirements of an activity as follows.
Duration of the activity:
The duration of an activity is the working time that a resource needs to carry out the activity and is calculated as follows
Duration of activity = fixed duration + (variable duration x order quantity/output quantity)
Resource consumption:
The resource consumption of an activity is the capacity of the resource that is necessary to carry out the activity and is calculated as follows
Resource consumption =
fixed consumption + (variable consumption x order quantity/output quantity)
These calculations are based on the formulas defined in the workcentre in the capacity tab page and scheduling tab page for each capacity category.
Ex setup formula and processing formula and other formulas.
Thanks.
nandha
·
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks a lot for your answer.
I understand the logic of capacity requirements in APO. What I am trying to do is to try to map PRTs in ECC (in a routing) to PDS and capacity planning in PPDS.
So far I have only found the link pointed out by Santosh and the apparently specific field in PDS to which I was referring (capacity requirements CAPORG field in the capacity requirements tab, which gets never populated in my tests (equipment-type PRTs).
The help available in the PDS CAPORG field states the following:
-
Capacity requierments.
Specifies the amount of time or number of production resources required to carry out the mode of an activity.
Use
This entry is used to calculate capacity requirements.
Example
You have specified the primary resource (such as worker or machine) on the Mode detail screen. In addition, you wish to assign a production resource/tool, which is necessary for capacity planning in the SAP APO, to the mode. In this case, you create a production resource of type 'operating facility' and assign it to the mode. In capacity requirements, you enter "1 piece."
-
James,
I know this is a very old thread but just trying out my luck. Were you able to utilize PRT in PP/DS PDS or used an alternate method to achieve this?
Thanks
AK
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks a lot for your help.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello,
Please note that the PRT can not be integrated with APO for PPM,PDS .The online link refers to the ISMill solution.
As an alternative ,you can model the tool as a secondary resource ,but this will not be a calendar resource & secondary resource can not be finitely scheduled. Livecache checks for the primary resource for scehduling.
Rgs - Vikas
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
For use of PRT in APO you need to define virtual workcenter with category PRT.
For details refer to link.
http://help.sap.com/saphelp_di471/helpdata/en/b2/05173d3215cc40e10000000a114084/content.htm
Regards,
Santosh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks a lot for your answer,
I already tried that, but coudn't find category PRT while creating the workcenter with CR01 nor any link to it inside customizing of existing categories (OP40).
Could you please elaborate?
thanks a lot,
Pablo Tortosa
PD. Besides, I am working with routings, does it make any difference?
User | Count |
---|---|