cancel
Showing results for 
Search instead for 
Did you mean: 

Error during PGI

safeer_rahman2
Contributor
0 Kudos

Hi Folks,

I have done all the necessary setting for testing the Scenario of Handling Unit Management (HUM).

I have created a sales order and Delivery document. Handling units were assigned to the materials through Edit-> Pack

While doing the PGI I am getting the following error.

ERROR L0 606 Quantity difference document line item for HU

Can anyone guide me what needs to be done in config or master data settings to eliminate this?

Thanks,

Safeer Rahman

Accepted Solutions (1)

Accepted Solutions (1)

Lakshmipathi
Active Contributor
0 Kudos
"ERROR L0 606"

This message should have been L9-606.

If so, check the following notes

=> Note 577351 - Repacking in HU02 with decentralized WM

=> Note 1010998 - TO confirmation ends with error message L9 606

=> Note 1459370 - VL60/BORGR- Inb del with HU's face error L9606 on GR posting

thanks

G. Lakshmipathi

safeer_rahman2
Contributor
0 Kudos

The problem was due to the non availablity of HU while doing the PGI.

Was able to run the whole cycle in BP document 226.

Thanks for your reply.

Safeer Rahman

Answers (0)