I want to inspect the first character of a material once in 10 lots during goods receipt inspection. If the first character is OK for the first lot then remaining 9 lots should be skipped otherwise I have to inspect the 2nd lot for the same. For which I have defined the Dynamic Modification Rule (DMR) as follows:

In inspection plan header I have mentioned the DMR level as DMR at Char level

Dynamic Modification at the Usage Decision

I have mentioned the reset period in days as 9999

Stage Insp Sev Skip Intial Stage Sort Text Stage Change No of Insp Max. Skip Duration New Stage Rejections New Insp Stage

1 4 Yes Initial stage Yes 1 2 1 1

2 Yes Skip 10 Lots Yes 10 1 2 1 1

I have implemented the above DMR rule. I have recorded results for the first lot due to DMR I found more than 10 lots are skipped for the particular characteristic.

Please help to solve this issue.

Thanks & Regards

V.Devaraj

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member42743
Active Contributor
0 Kudos

Shouldn't your skip stage be 9 lots and not 10? Otherwise you are doing inspection once every 11.

Make sure you fully vaulted and closed, (status 5) the characteristic. Also make the UD. If you expect consistent results the UD must be done before the next inspection lot is created.

FF

Former Member
0 Kudos

Can you please rephrase 2nd stage in detail...........