Hi,
We have done requirment grouping by setting grouping indicator 1 in a 3 rd level WBS and done grouping in GRM4 with 4th level WBS. Now i can issue the stock which is existing on 3rd level WBS to 4th level WBS (Because of requiremeng grouping done). But i am not able to issue the stock which is at 4th level of WBS to it self (i.e, ,4th level WBS). System is giving error of deficit of project stock. How can this possible and what should i do to issue the stock at 4th level WBS to the same WBS after applying requirement grouping.
Regards,
Kalpesh
if requirement grouping is there then there should not be any stock on 4th level WBSE. I think you kept the stock manually on 4th level not the system generated requirement. Please do transfer posting from 4th level to 3rd level so that you can do GI.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
104 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.