cancel
Showing results for 
Search instead for 
Did you mean: 

Changes Allowed to shipment cost doc after MIGO

Former Member
0 Kudos

Hi All,

I am facing a very awkward problem, I have done MIGO for shipment cost but system is still allowing me to change shipment cost document & its value. whether its standard system or some configuration is missing. I am from MM background so i dont know much about SCM. So kindly guide me.

Thanks & Regards

Nitesh

Accepted Solutions (0)

Answers (1)

Answers (1)

gallada
Participant
0 Kudos

Hi,

please check the shipment cost document contsins the same PO in all line items.

may be you are doing MIGO for one PO item and also check the entry sheet referred in shipment cost document. accpet the entry sheet your requirement will be fulfilled.

Regards

Gowri